H1 General
anthony.sanchez@LIGO.ORG - posted 08:06, Monday 20 July 2026 (91118)
Ops Monday Morning report

TITLE: 07/20 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 3mph Gusts, 1mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.09 μm/s 
QUICK SUMMARY:

VAC Status: HAM1 pressure is currently at 8.45xe-7 Torr. and everywhere else around  1e-6 torr. 

I'm resetting the tripped ETMY HEPI & ISI  watchdogs that tripped in the last earthquake.

LVEA Is still Laser Hazard.

Trello schedule: 
Unlock all HEPI (see where VAC is going to need access)
DRMI Locking work!
PSL incursion to swap SPI shutter cable to perm one
Early Mornings - Cleanroom Maint work (needs lift) Randy
Leak checking all over the LVEA
Remove NEG pumps off Output Tube, LVEA?