TITLE: 07/21 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 2mph Gusts, 0mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.09 μm/s
QUICK SUMMARY: Commissioning of the JAC and more IMC/corner locking work planned for today along with continued leak checking of the vacuum volumes. Looks like the IMC is staying locked nicely with it only dropping out a few times overnight, where most of these correspond wiht JAC unlocking as well.