Displaying report 1-1 of 1.
Reports until 12:12, Tuesday 21 July 2026
H1 IOO (EPO, IOO)
corey.gray@LIGO.ORG - posted 12:12, Tuesday 21 July 2026 - last comment - 12:44, Tuesday 21 July 2026(91150)
PRM Reflected Light Confirmed To Be Centered On HAM2 Rooftop Beam Dump (aka

CamillaC, CoreyG, RyanS (locked up the IMC at low power for us, with help from Sheila & JennieW)

For reference, see the following alogs & DCC page:  alog61866, alog17788, D1201430

Initial delay to this work was trying to get low power (250mW) from the IMC for a beam to use for this check.  However, we now have JAC, so this added some complications for low-power locking; additionally, IMC locking is still fairly new & fresh post-recent-vent-work.  

Once we had a nice beam to work with we went out to HAM2.  Before we went upstairs, we grabbed an IR card, lexan plate (from the standard guillotine), and a CDS laptop.  This time around we don't have the scaffolding at HAM2's West Side, so we decided to climb up from the East Side since we had several blank flange ports to use for hand/foot holds.  For each climb, we stepped on the steel platform above the HEPI cage (but this still would break IMC lock...but it came back fast).  Did NOT use fall protection since there is a handrail right where we would be working atop HAM2.

Steps For The Check:

Below are photos from this activity along with "before" photos of beams as we found them.  Camilla will alog the "after" photos of how the beam looked after some PRM tweaks.

Images attached to this report
Comments related to this report
camilla.compton@LIGO.ORG - 12:44, Tuesday 21 July 2026 (91158)

Attached are photos of the beam as we left it on the steering mirror and beamdump.

We moved the PRM alignment sliders +500urad in Pitch to get the beam unclipped looking. This was saved as an addition to the misalignment values in sus/h1/guardian/susconst.py, see attached. We then reloaded SUS_PRM and checked when taking it t misaligned that the top mass osems when to the location we expected. 

During this work PRM alignment sliders nominal was Pitch -1115, Yaw -270

Images attached to this comment
Displaying report 1-1 of 1.