TITLE: 07/21 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Oli
SHIFT SUMMARY: Lots of great progress today, including the Michaelson getting locked with the new BBSS! The LVEA remains Laser HAZARD.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:13 | FAC | Kim | LVEA | - | Technical cleaning | 16:25 |
| 15:15 | VAC | Jordan | LVEA | - | Turning on leak detector | 15:22 |
| 15:25 | FAC | Chris, Eric | EX, MX, EY, MY | - | AHU fan greasing | 16:41 |
| 16:10 | VAC | Travis, Jordan | LVEA | - | Leak checking w/ turbo isolated (slight P drop) | 16:55 |
| 16:20 | TCS | Corey | MER | - | TCS chiller checks | 16:35 |
| 16:23 | CAL | Tony, RyanC, Cory | EX | Y | PCal measurement | 19:19 |
| 16:24 | PEM | Carlos, Shrey, Robert | Overpass | - | Seismometer tests | 18:01 |
| 16:25 | FAC | Kim | FCES | - | Technical cleaning | 17:25 |
| 16:30 | SEI | Jim, Shoshana | LVEA | - | Stickers on CRS laser | 16:54 |
| 16:59 | VAC | Travis | LVEA | - | Turning off HAM3 cleanroom | 17:02 |
| 17:24 | SQZ | Camilla | LVEA | - | Grabbing beam scanner | 17:40 |
| 17:26 | VAC | Travis | LVEA | - | HAM3 door flange tape removal | 17:29 |
| 17:26 | FAC | Kim | MY | - | Technical cleaning | 18:14 |
| 17:38 | ISC | Corey, Camilla | LVEA | Y | Porcupine beam dump check | 18:23 |
| 17:42 | TCS | Madi | OptLab | - | Testing lenses | 18:41 |
| 19:10 | TCS | Camilla | LVEA | - | Measuring camera can position | 19:29 |
| 19:17 | CDS | Dave, Erik | Remote | - | EDC & DAQ restarts | 19:57 |
| 19:20 | CAL | Tony, RyanC, Cory | PCalLab | - | Wrapping up measurement | 19:59 |
| 19:26 | PEM | Shrey, Carlos | Overpass | - | Seismometer tests | 22:15 |
| 20:04 | VAC | Gerardo, Jordan | LVEA | - | Checking pumps | 20:13 |
| 21:00 | VAC | Gerardo, Jordan | LVEA | - | Craning pump at CP1 | 21:24 |
| 21:01 | CAL | Tony | EX | - | Grabbing something | 21:22 |
| 21:16 | SQZ | Camilla, Rachel | LVEA | Y | HAM7 power budget | 23:07 |
| 21:18 | TCS | Madi | OptLab | - | Testing lenses | 22:05 |
| 21:29 | ISC | Sheila, Keita | LVEA | Y | ISCT1 alignment | 21:48 |
| 21:51 | AOS | Betsy | CER | - | Cable inventory | 22:34 |
| 22:07 | VAC | Travis | LVEA | - | Parts cleanup | 22:43 |
| 22:35 | VAC | Gerardo, Jordan | LVEA | - | Adding turbopump to corner volume | 23:16 |
| 23:06 | SEI | Fil | CER | - | Installing HAM2 L4C chassis | Ongoing |
| 23:12 | ISC | Sheila, Keita | LVEA | Y | ISCT1 alignment | Ongoing |
| 23:13 | TCS | Camilla, Madi | OptLab | - | Eye-safe laser tests | Ongoing |