TITLE: 07/22 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Not much else happened today after the end of Ryan S's shift. Sheila and Keita went out to ISCT1 to align the POP path but were not able to make much progress, so commissioning stopped for the day.
JAC is being left LOCKED but IMC was taken OFFLINE so Jim can take some measurements.
LVEA is LASER HAZARD
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 23:06 | SEI | Fil | CER | - | Installing HAM2 L4C chassis | 23:57 |
| 23:12 | ISC | Sheila, Keita | LVEA | Y | ISCT1 alignment | 00:06 |
| 23:13 | TCS | Camilla, Madi | OptLab | - | Eye-safe laser tests (Camilla out 23:50) | 00:11 |