H1 General
oli.patane@LIGO.ORG - posted 17:45, Tuesday 21 July 2026 (91173)
Ops EVE Shift End

TITLE: 07/22 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Not much else happened today after the end of Ryan S's shift. Sheila and Keita went out to ISCT1 to align the POP path but were not able to make much progress, so commissioning stopped for the day.

JAC is being left LOCKED but IMC was taken OFFLINE so Jim can take some measurements.

LVEA is LASER HAZARD


LOG:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   

Start Time System Name Location Lazer_Haz Task Time End
23:06 SEI Fil CER - Installing HAM2 L4C chassis 23:57
23:12 ISC Sheila, Keita LVEA Y ISCT1 alignment 00:06
23:13 TCS Camilla, Madi OptLab - Eye-safe laser tests (Camilla out 23:50) 00:11