TITLE: 07/22 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 6mph Gusts, 3mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.10 μm/s
QUICK SUMMARY: More work today towards locking DRMI planned. The IMC was left offline overnight, but the JAC looks like it's been locked for roughly the past 13 hours. The LVEA remains Laser HAZARD and the corner/HAM1 continues pumpdown.