TITLE: 07/23 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 9mph Gusts, 6mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.16 μm/s
QUICK SUMMARY: Work continues towards DRMI locking today. JAC and IMC were left offline overnight, and there was a short stint in EQ mode since sensor correction is still on.