Ops Day Shift Summary

TITLE: 07/23 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Good progress today towards DRMI, see commissioning notes in alog91211. HEPI was unlocked for HAMs 1 & 2; see alog91218. Dust alarms throughout the day in the LVEA and optics lab. The LVEA remains Laser HAZARD and corner volumes are still pumping down.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:41 FAC Kim, Dawn LVEA, OptLab - Technical cleaning 15:31
15:27 VAC Jordan MY - Reset pump 15:53
15:57 FAC Kim LVEA - Technical cleaning 16:27
16:26 SPI Jennie LVEA - Checking electronics in SUS rack 17:37
16:28 FAC Kim MX - Technical cleaning 17:29
16:35 ISC Sheila LVEA Y ISCT1 alignment 17:09
17:04 TCS Camilla OptLab - Looking for camera cans 17:20
17:20 VAC Jordan LVEA - Cleanup by CP1 18:53
18:02 SPI Jennie LVEA - Checking electronics in SUS rack 18:26
18:06 TCS Camilla, TJ LVEA - Attaching camera cans 18:58
18:51 ISC Sheila LVEA Y ISCT1 alignment 19:08
19:03 TCS Camilla, Jackie PrepLab - CHETA work 19:37
19:26 SEI Jim LVEA - Unlocking HEPI, BSC2 tests 20:03
20:46 CDS Fil LVEA - Terminating cables 21:40
21:14 SUS Oli LVEA - MC2 cable swaps 21:40
21:24 TCS Camilla PrepLab - Checking cables 21:41
21:34 VAC Jordan, Gerardo EY - Prepping for pump swap Ongoing
Comments related to this report
ibrahim.abouelfettouh@LIGO.ORG - 18:01, Thursday 23 July 2026 (91225)

Continued work on DRMI - nothing further to add.

JAC_HEATER Guardian is off. IMC is offline. IFO is open to anyone who wants to take measurements.

Start Time System Name Location Lazer_Haz Task Time End
14:41 FAC Kim, Dawn LVEA, OptLab - Technical cleaning 15:31
15:27 VAC Jordan MY - Reset pump 15:53
15:57 FAC Kim LVEA - Technical cleaning 16:27
16:26 SPI Jennie LVEA - Checking electronics in SUS rack 17:37
16:28 FAC Kim MX - Technical cleaning 17:29
16:35 ISC Sheila LVEA Y ISCT1 alignment 17:09
17:04 TCS Camilla OptLab - Looking for camera cans 17:20
17:20 VAC Jordan LVEA - Cleanup by CP1 18:53
18:02 SPI Jennie LVEA - Checking electronics in SUS rack 18:26
18:06 TCS Camilla, TJ LVEA - Attaching camera cans 18:58
18:51 ISC Sheila LVEA Y ISCT1 alignment 19:08
19:03 TCS Camilla, Jackie PrepLab - CHETA work 19:37
19:26 SEI Jim LVEA - Unlocking HEPI, BSC2 tests 20:03
20:46 CDS Fil LVEA - Terminating cables 21:40
21:14 SUS Oli LVEA - MC2 cable swaps 21:40
21:24 TCS Camilla PrepLab - Checking cables 21:41
21:34 VAC Jordan, Gerardo EY - Prepping for pump swap 22:36
22:34 TCS Camilla CHETA lab/ LVEA N Parts grab 22:59
22:37 VAC Gerardo, Jordan LVEA YES Checking on BSC2 pump 23:01
22:53 PEM Robert, Miranda LVEA YES Setting up shakers for solar farm analysis 23:16
23:08 SEI Jim LVEA YES Rack retrieval HAM3 23:14
00:04 VAC Jordan MY N Pump closure 00:15
00:59 VAC Gerardo LVEA YES Picture 01:59