TITLE: 07/24 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 5mph Gusts, 2mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.10 μm/s
QUICK SUMMARY:
The Vacuum pressure is still being pumped down.
CDS team needed to reboot the NDS server again so the NDScope screen shots may stop beifly.
SUS: First stage of PRM seems to be pushing a bit harder than I'd expect given that it's misaligned.
Restarting some stuck IOCs:
MX weather station has been down since the power outage Thu16jul2026. This runs as a containerized IOC on the service host cluster. I restarted its PCS resource, it is running again.
The CDS Rack Smart Power Strip IOC has been down for a few days. It runs as a systemd service on cdsioc0. I restarted pwr_strip_ioc.service, it is running again.