Reports until 19:43, Monday 06 January 2014
H1 ISC
sheila.dwyer@LIGO.ORG - posted 19:43, Monday 06 January 2014 (9125)
X end refl PDs aligned

There is currrently 5.8mW on the refl PD A this signal is not showing up in the fast digital system, neiher the beckhoff readback nor the fast system readbacks are working for this channel right now.  

Refl B has 1.4mW of green aligned onto it REFL_B_LF_OUTPUT is 15500 right now and beckhoff is reading 4.6V.  The hardware switch on this is currently set to 20dB. 

I also aligned the QPD and plugged X (which is vertical the way the qpd is mounted) into ISC extra Analog input 1, Y (horizontal) into analog input 2, and the sum into analog input 3.  right now there is 6.2mW on the QPD, resulting in 4.7 V on sum, and roughly zeroed in X and Y.