TITLE: 07/28 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY:
Today was the first main day for the RCG Upgrade (so lots of systems are down for this work). The RCG work will definitely continue tomorrow!
LOG:
- 1415 Scissor lift move (randy)
- 1437 SEI_ENV to MAINTENANCE
- 1438-1532 technical cleaning in lvea (kim.dawn)
- 1714-1801 back in lvea (kim)
- 1803-1851 Going to EX (kim)
- 1854-1504 SEI & SUS: SEI taken to ISI DAMPED HEPI OFFLINE
- 1518 SDF checks (tony, tj)
- 1521 LASER STOP BUTTON--> I got to hit the big red button in the Control Room for Fil to start Access System work! (watched the PSL cameras next to the button & confirmed beams disappeared!). In hindsight, I guess I should have waited a little because Tony & TJ were looking at SDFs and mentioned it would have been nice to wait a few minutes for them! lol
- Now that Lasers on ACCESS System are OFF, we are Upgrade Phase
- 1525-1655 Cleanroom move out of Biergarten (randy.eric.chris.tyler.jordan)
- 1553-1940 MX+EX Turbo pump maintenance tests (travis)
- 1607-1840 EX+EY trip for RCG (dave.tony)
- 1610-1723 Seismometer testing at bridge berm (carlos.shrey)
- 1615-1710 LVEA walkabout (richard)
- 1618-1621 Closing PSL+ALS light pipes (oli)
- 1626-1804 ZM5 continued (rahul, ryanC)
- 1626-1802 Norco LN2 delivery to CP2 @LVEAx
- 1636-1711 Moving a new hefty wire rack from receiving to HAM6 (jim)
- 1653-1711 HAM3 peak thru a viewport (shoshonna.jim)
- 1700-1748 EY Annulus Ion Pump check (jordan)
- 1705-1852 cleanroom fans @westbay (randy)
- 1940-2139 continued in afternoon (randy)
- 1705-1754 CRS Safety interlock set-up near TCS racks (fil)
- 1720 Interlock software (patrick)
- 1726-1910 Pacific CA Systems delivery of LN2 to EX
- 1728-1804 spi shutter cable & test dustmonitor (jason.ryanS)
- 1731-1857 connecting PSL dust monitor (+ IR x-arm spool camera) [tj]
- 1732-1804 fire pump maintenance checks (eric)
- 1739-1857 IR X-arm spool camera (camilla)
- 1800-1833 Checking EX.EY HEPI pump stations(jim)
- 1811-1815 Moving a cart from OSB Cleaning Area to Staging (ibrahim)
- 1845-1910 JAC table & PSL racks (jennie)
- 1930-2130 EY trip for RCG (dave.tony)
- 1936-2249 CER+Mech Rm Mezzanine to document S/Ns for LIGO Timing & DAQ cards (fil)
- 1944 staging for HAM2 AIP (gerardo)
- 2015 Seismometer testing at bridge berm (carlos.shrey.robert)
- 2025-2103 FAMIS checks at MY/EY/MX (chris)
- 2031-2102 SQZ rack measurements for PSAMs (rahul, ryanC)
- 2042-2058 GV6 parts staging (jordan)
- 2047-2053 swapping in another cps probe for BSC2 SEI ISI (jim)
- 2055-2120 JAC table pics (jennie)
- 2122 Grabbing beam profiler from HAM7 (camilla.maddi)
- 2123-2142 PNNL tour (cassidy)
- 2139 GV6 staging & scaffolding tests (gerardo)
- 2207 joined by jordan & travis
- 2140-2207 EY AIP pumpdown check (jordan)
- 2138-2253 EY table checks (camilla.maddi)
- 2206 Beckhoff reboot for channel name change (daniel.ryanS)
- 2312 Labeling CRS+SPI optical Fibers with laser hazard stickers for HAM1/2/3(fil)
- 2314 Small group tour (ibrahim)