WP13457 CDS Ethernet IPC/RCG Upgrade status

Jonathan, Dave, Erik, Tony, Cory, EJ,

As per WP 13457 we started the dolphin to ethernet transition today.

We broke into two groups, Dave and Tony when to the end stations.  Erik, Jonathan, and Cory worked in the corner station.  EJ provided remote support.

Current status:

Issues that we have hit

We have shown the ability to pass some IPC traffic between a few nodes.  We are doing a fresh build and install of the models to fix an issue with the target/install folder location being incorrect.  We plan on starting the models tomorrow morning.

The seis ai chassis are on in the end stations, and off in the corner station.