TITLE: 07/31 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
ITMX ISI stage 1 & 2 WD tripped and there seems to be some ground motion there that may have tripped them.
But The BS HEPI and ISI seems to be fine as of writing!