Displaying report 1-1 of 1.
Reports until 08:09, Monday 03 August 2026
H1 General
anthony.sanchez@LIGO.ORG - posted 08:09, Monday 03 August 2026 (91365)
Monday Ops Morning report

TITLE: 08/03 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 4mph Gusts, 2mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.09 μm/s 
QUICK SUMMARY:

IFO status: Currently Unlocked. Both GV5 and GV7 are shut..... for now.
Corner pump down continues.
Spool cameras work to reinstall IR cameras.
More Distributed acoustic  sensing DAS system.

Displaying report 1-1 of 1.