TITLE: 08/03 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 4mph Gusts, 2mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.09 μm/s
QUICK SUMMARY:
IFO status: Currently Unlocked. Both GV5 and GV7 are shut..... for now.
Corner pump down continues.
Spool cameras work to reinstall IR cameras.
More Distributed acoustic sensing DAS system.