TITLE: 08/10 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: EARTHQUAKE
Wind: 7mph Gusts, 4mph 3min avg
Primary useism: 0.58 μm/s
Secondary useism: 0.09 μm/s
QUICK SUMMARY:
NOTE: Both Ops work stations had troubles logging in (I could enter my username, but then the computer would freeze...for both computers). So I'm back here at cdsws27. It worked, but it was a little slow.
We had a M7.4 earthquake in Bogota (sort of in between Cali/Medellin/Bogota) that rolled in here about 2hrs ago. Looks like this has mainly tripped mostly LVEA HAMs. Picket Fence is lighting up in yellow also.
Oh and Rattlesnake Mountain finally returns (after missing quite a bit last week due to a smoky week). AQI for Richland (closest sensor on AirNow) is at a YELLOW 71. Only active fire in Benton Franklin counties is far away up near Kahlotus (Nunamaker Road Fire with 20k+ acres.
Also, the GWANW (Gravitational Wave Astronomy North West) meeting will be hosted here at LHO today and tomorrow.
Post NOTE: Looks like BOTH ops workstations have now moved to the password for the login, so I will try to move back there.
Untripped HAMs 1-5+8 After the Colombia EQ tripped them at 1245utc (545amPDT).
Whoops...apparently I did NOT un-trip HAM8 ISI. But that's ok since SEI group is working on CPS for HAM8 this morning.