Reports until 16:33, Monday 10 August 2026
LHO General
corey.gray@LIGO.ORG - posted 16:33, Monday 10 August 2026 (91458)
Mon Day Ops Summary

TITLE: 08/10 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan S

SHIFT SUMMARY:

Input Align & ZM4 work continued today with LVEA being transitioned to HAZARD toward the end of the shift for checks at ISCT1.

Apollo on-site to begin work addressing a beam tube enclosure section which is failing by installing framework inside the beam tube enclosure (this section in question is part of X1 on the Xarm [near the bridge]).

VAC team has been preparing for the quick X-arm opening peek tomorrow.

 LOG: