Fil, Betsy
Today Fil and I did a quick repeat of T2200048 HAM7 ground loops check just before doors are going on.
Last checks were done:
Feb this year by Camilla/Sheila https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=89048
Feb 2022 Fil/me https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=61738
Keita had done them prior, hence the document.
We basically found the same results as Camilla/Sheila namely:
All the rest were "open".