Reports until 10:22, Wednesday 08 January 2014
LHO VE
john.worden@LIGO.ORG - posted 10:22, Wednesday 08 January 2014 (9154)
End Station Pumpdown and transition to BT

The attached plot shows the XEND pump down and transition to BT operation. 30 days are shown.

Over the Christmas break we operated on the main turbo only. On Jan 6 the transition to the main ion pump and 80K pumps was made.

After isolating the main turbo the beam tube valve was opened for HIFO X  work.

You can see that the the pressure has come to ~4e-8 torr in the BSC chamber (pt510). The two gauges on the 80K pump and the beam tube are both below 2e-8 torr.

In summary the transition from turbo only to final configuration has bought us slightly more than a factor of 10 improvement in pressure.

 

The LVEA transition is shown in this alog https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=9119

 

For reference, guidance related to opening to the beam tube is here: https://dcc.ligo.org/LIGO-T1300802

Images attached to this report