TITLE: 08/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 5mph Gusts, 3mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.08 μm/s
QUICK SUMMARY: With all chambers now closed and pumpdown ongoing, the focus this week will be continuing corner alignment and improving DRMI locking. The IMC is locked at 2W and the LVEA is Laser SAFE.