Ops Day Shift Summary

TITLE: 08/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: After diagnosing some alignment troubles, work has continued towards being able to lock PRMI. The ITMY HWS SLED was swapped, the corner volumes continue to be pumped down, and the LVEA is still Laser HAZARD.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:38 FAC Randy LVEA - ISI craning prep 15:31
14:52 FAC Kim LVEA - Technical cleaning 15:47
16:35 PSL Jason OptLab - Parts search 16:56
17:04 SEI Jim FCES - HAM8 ISI work 21:04
17:07 FAC Kim EY - Technical cleaning 18:07
18:26 VAC Gerardo LVEA - Checking HAM7 18:31
19:52 FAC Randy LVEA - Craning scissor lift 20:52
20:45 VAC Gerardo, Travis LVEA - Prepping to move super sucker from HAM1 to HAM6 21:25
21:22 SEI Shoshana, Huyen LVEA - Removing CRS laser copper block 21:32
21:42 DAS Jenne, Reinhardt LVEA - Running DAS fiber 22:10
22:08 SAF TJ LVEA YES Transitioning to Laser HAZARD 22:40
22:42 TCS TJ, Camilla LVEA YES Swapping ITMY HWS SLED 23:29