TITLE: 08/19 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
IFO is in IDLE with IMC Locked and Power at 2W
Evening was spent trying to comisson BBSS M3 stage as a way to aid with alignment. Keita, Louis and Elenna have some next steps to try tomorow. See alog 91593.
After they were finished and per Jennie's instructions I changed the JAC Heater POWER_SET from 1.465 to 3. Then, I informed Huyen that Seismic overnight tests can begin.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:54 | FAC | Kim | EX | - | Technical cleaning | 16:21 |
| 15:01 | FAC | Eric | Outbldgs | - | AHU checks | 16:47 |
| 15:52 | PEM | Robert | LVEA | - | Looking at fiber locations | 17:33 |
| 16:01 | VAC | Travis | LVEA | - | Moving pump from HAM1 to HAM6 | 16:30 |
| 16:32 | FAC | Kim | LVEA | - | Technical cleaning | 17:36 |
| 16:34 | PSL | Jason | PSL | Y | Parts search | 16:50 |
| 16:41 | SEI | Jim | CER | - | HAM3 ISI measurement | 18:24 |
| 16:48 | FAC | Chris | LVEA | - | Safety checks | 17:37 |
| 16:53 | TCS | TJ, Camilla | LVEA | Y | Checking HWS and CO2 tables | 19:46 |
| 17:33 | PEM | Robert, Reinhardt | MER/LVEA | - | Running DAS fibers (Robert out at 23:52 UTC) | 00:29 |
| 17:56 | FAC | Kim | FCES | - | Technical cleaning | 18:55 |
| 18:08 | TCS | Jennie | LVEA | Y | Looking for RF source | 18:19 |
| 18:11 | VAC | Travis, Gerardo | LVEA | - | Valve in HAM6 turbopump | 18:24 |
| 18:26 | TCS | Fil | LVEA | - | Troubleshooting CO2 laser | 19:46 |
| 18:47 | AOS | Betsy | LVEA | - | Checks in W-bay | 19:08 |
| 19:34 | FAC | Randy | LVEA | - | Pulling 3IFO ISI container lid | 22:30 |
| 19:48 | SUS | Jason | OptLab | - | Checking oplev lasers | 21:39 |
| 20:08 | VAC | Gerardo | LVEA | - | Starting leak detector on BSC8 | 23:31 |
| 20:14 | AOS | Betsy | LVEA | - | W-bay cleanroom move | 21:25 |
| 20:19 | VAC | Travis | LVEA | - | Leak checking and cleanroom move | 23:25 |
| 20:29 | AOS | TJ | LVEA | - | W-bay cleanroom move | 21:09 |
| 20:56 | SEI | Shoshana, Huyen, Jim | LVEA - H2 PSL | - | CRS cleanup | 22:37 |
| 21:25 | TCS | Camilla, TJ | LVEA | Y | CO2Y troubleshooting | 22:48 |
| 22:11 | EE | Jackie | MER | - | Replacing BHD chassis | 23:12 |
| 23:29 | TCS | Camilla | OptLab | - | Tidying up | 23:54 |
| 00:10 | PEM | Robert | EX | Y | Finding glasses | 00:23 |
| 01:54 | VAC | Gerardo | LVEA | Y | HAM6 Turbopump valve | 02:08 |