TITLE: 08/20 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Multiple optics lab dust alarms throughout the day, corner alignment, we did not get to PRMI or DRMI as there was a ALS slow controls issue unlocking XARM. The main Beckhoff computer seems to be having connections issues, a restart is required to fix this, and it will be done tomorrow.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:02 | FAC | Kim | LVEA | Y | Tech clean | 16:06 |
| 15:36 | TCS | Camilla | CR | N | ITMY CO2 blasting | 16:36 |
| 16:20 | VAC | Travis | LVEA | Y | Check HAM7 pumpdown | 16:29 |
| 16:24 | PEM | Reinhardt | LVEA | Y | PEM checks | 18:09 |
| 16:41 | FAC | Kim | MidY | N | Tech clean | 17:42 |
| 16:44 | ISC | Betsy | Mech room | Y | Equipment Checks | 17:12 |
| 16:50 | SEI | Jim, Mitch | Mids | N | Equipment checks | 17:43 |
| 16:58 | VAC | Travis | LVEA | y | Turning off turbo pumps | 17:31 |
| 17:23 | ISC | Camilla, Elenna | LVEA | Y | ISCT1 table DIFF beatnote adjustment | 17:42 |
| 17:42 | FAC | Kim | H2 building | N | Tech clean | 17:53 |
| 19:54 | ALS | Keita | EndY | N | Troubleshoot ALS WFS issue | 21:16 |
| 19:56 | ALS | Keita | CER | Y | Grab cds laptop | 19:56 |
| 20:08 | EE | Marc, Fil | EndY | N | ALS wfs troubleshooting | 21:15 |
| 20:58 | PEM | Reinhardt | LVEA | Y | PEM work cont. (fibers) | 21:40 |
| 21:17 | VAC | Travis | LVEA | Y | Finish turning off turbo pumps | 21:23 |
| 21:33 | TCS | Camilla | Prep lab | N | CHETA checks | 21:50 |
| 21:43 | SAF | Richard | Mech room | N | Reboot access system network switch | 21:53 |
| 21:48 | PEM | Robert, Reinhardt | Output arm | N | Shaker injections to tests new fibers | 21:59 |
| 21:53 | PSL | Jason | MidY then X | N | Look for old PSL chiller | 22:28 |