Now that the alignment of the cavities is roughly good, I aligned the ITMX, PR3, HAM2, HAM3, and ETMX optical levers to their respective optics/HAMs. It's relevant to note that the connector of the controller for the translation stages broke, we were able to re-solder the wires but the connection is very fragile. I'll just have to be careful when moving it around but it'd be best to have a system where we're not constantly unplugging and plugging in delicate wires every time we want to re-align the pointing.