TITLE: 08/26 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Commissioners continued locking work and once they were done, Jim took over with SEI measurements overnight.
LOG:
- 2318-2324 Cleaning Room visit (betsy)
- Well pump is on until about 245utc/745pmPDT (tyler)
- 2345-0040 rfpd inventory checks at Staging (corey)
- 0107 Phoned Jim to let him know Commissioning work is done for the night. He will begin his long SEI: measurements for the night (no one in the Control Room needed for his work).
- 0115 Seismic to MAINTENANCE (Jim?)
- 0118, 0119 BS St2 trips