Displaying report 1-1 of 1.
Reports until 07:34, Friday 28 August 2026
LHO General
thomas.shaffer@LIGO.ORG - posted 07:34, Friday 28 August 2026 (91720)
Ops Day Shift Start

TITLE: 08/28 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 7mph Gusts, 3mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.10 μm/s 
QUICK SUMMARY: No alarms, calm environment. The EX VEA temperature has been moving around quite a bit the last few days. Looks like this was from the cleanroom being turned on.

Images attached to this report
Displaying report 1-1 of 1.