Reports until 16:31, Monday 31 August 2026
LHO General
thomas.shaffer@LIGO.ORG - posted 16:31, Monday 31 August 2026 (91742)
Ops Day Shift Start

TITLE: 08/31 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Oli
SHIFT SUMMARY:

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:30 FAC Kim MY, MX n Tech clean 17:00
17:01 FAC Kim FCES n Tech clean 18:20
17:20 CDS Fil EY n ESD troubleshooting 18:09
19:25 FAC Chris FCES n Saving a snake 19:26
20:52 CDS Jackie Mech Room n BDH chassis install on mezz 22:14
21:47 VAC Gerardo, Jordan EY, EX n EY annulus ion pump troubleshooting, then to EX to prep for TMDS 22:34
22:23 TCS Camilla, Jackie CHETA Lab n Popping in 22:35