Reports until 17:47, Monday 31 August 2026
H1 General
oli.patane@LIGO.ORG - posted 17:47, Monday 31 August 2026 (91759)
Ops EVE Shift End

TITLE: 09/01 Eve Shift: 2330-0045 UTC (1630-1745 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY: Commissioning ended early today. Not much luck with IR DIFF today. Camilla did the transition to laser safe this afternoon so the LVEA is in LASER SAFE and ready for tomorrow's activities.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
22:23 TCS Camilla, Jackie CHETA Lab n Popping in 22:35
23:43 SAF Camilla LVEA Y->n Transitioning LVEA to laser SAFE 00:01