TITLE: 09/01 Eve Shift: 2330-0045 UTC (1630-1745 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY: Commissioning ended early today. Not much luck with IR DIFF today. Camilla did the transition to laser safe this afternoon so the LVEA is in LASER SAFE and ready for tomorrow's activities.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 22:23 | TCS | Camilla, Jackie | CHETA Lab | n | Popping in | 22:35 |
| 23:43 | SAF | Camilla | LVEA | Y->n | Transitioning LVEA to laser SAFE | 00:01 |