Reports until 16:33, Wednesday 02 September 2026
LHO General
thomas.shaffer@LIGO.ORG - posted 16:33, Wednesday 02 September 2026 (91786)
Ops Day Shift Start

TITLE: 09/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY:

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:07 FAC Kim Opt Lab n Tech clean 15:30
16:31 - Tyler, Dolly, +1 LVEA n Tour 17:31
17:04 FAC Kim EX n Clean in prep for vent 19:00
17:47 SPI Marc, Jennie LVEA n Taking picture of SUS R2 rack 17:58
18:18 ISC Sheila, Louis LVEA Local ISCT1 table alignment 18:59
20:18 VAC Gerardo, Jordan EX n Closing GV20 and setting up TMDS 00:18
20:34 FAC Chris EX n Top of chamber cleaning 21:29
20:35 SPI Jennie LVEA n SUS R2 rack SPI 22:00
20:38 PSL Jason Opt Lab n Checking on EOM for next week 20:54
20:46 TCS Camilla, Jackie Prep Lab YES CHETA lab laser work 23:26
21:04 - Tony LVEA rec. n Comm system organization 21:08
21:41 SUS Daniel, Rahul EX n TMDS setup 22:23
23:18 SPI Jennie LVEA n SPI electronics rack work 00:28