Vacuum Recovery From TMDS Work at X-End

(Jordan V., Richard M., Gerardo M.)

After the second discharge at BSC9, we removed the ionizer from the injection port and installed a 2.75" CF blank on its place.  We started the pumpdown, and after a few minutes we dumped the dead volume between the tiny injection gate valve and the blank into the main volume.  We used the two ISP-1000 to start the rough down, but stopped at 5:50 pm local time for the night, vacuum pressure is at 5.35 Torr, pumpdown will restart tomorrow.

During both discharges, noted here, we encountered some minor issues that were dealt with on the fly.

Images attached to this report
Comments related to this report
jordan.vanosky@LIGO.ORG - 15:52, Friday 04 September 2026 (91817)

Pictures of the mini gate valve after removing the TMDS assembly, showing pinched o-ring.