This morning, Gerardo and I prepped the ITM03 test mass (side S3) and it's associated ear (s/n 95) for ear bonding. He then silicate bonded the ear to S3. After the usual 2 hours of intermittant inspection, he remeasured and confirmed that the position was within spec. Tomorrow morning we plan to do the S4 side ear bonding.