Reports until 13:41, Thursday 09 January 2014
H1 SUS
betsy.weaver@LIGO.ORG - posted 13:41, Thursday 09 January 2014 (9181)
ITM03 (H1-ITMx) first ear bonded sucessfully

This morning, Gerardo and I prepped the ITM03 test mass (side S3) and it's associated ear (s/n 95) for ear bonding.  He then silicate bonded the ear to S3.  After the usual 2 hours of intermittant inspection, he remeasured and confirmed that the position was within spec.  Tomorrow morning we plan to do the S4 side ear bonding.