TITLE: 09/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 5mph Gusts, 2mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.13 μm/s
QUICK SUMMARY:
Looks like great progress yesterday with X-arm opened and locking green arms. This morning ISC LOCK is at Prep For Locking, there were multiple dust alarms, and all is fairly quiet otherwise.
Reran launch script for nuc25 to bring up the DRMI FOM Displacements dtt.