Reports until 16:50, Wednesday 09 September 2026
H1 General
anthony.sanchez@LIGO.ORG - posted 16:50, Wednesday 09 September 2026 (91857)
Wednesday OPS EVE Shift Start

TITLE: 09/09 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: Corey
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 16mph Gusts, 9mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.11 μm/s 
QUICK SUMMARY:
The Comissioners are Working on DRMI alignment and Locking seems like H1 is going through Green Arms and IR just fine.
VAC Team is currently working on HAM7 valving.