TITLE: 09/10 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
The Mega Clean room was Turnt Off. For What!? You may ask? Because we are trying to get closer to our final LVEA temperature for locking the IFO.
GRB-Short E646174 notification @ 1:24:41 UTC
H1 is now sitting in down er rather Prep for locking..
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 22:35 | vac | VACteam | EY | - | vendor visit to EY | 23:50 |
| 23:42 | VAC | Jordan Gerardo | LVEA HAM7 | N | Valving swap on HAM7 | 23:53 |
| 00:40 | VAC | Gerardo | LVEA | N | Turning Off the Mega Clean room | 00:49 |