TITLE: 09/10 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 6mph Gusts, 4mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.11 μm/s
QUICK SUMMARY:
Locking work continues around DRMI & with other spots. Guessing the Relay Tube (with no leaks & MegaCleanroom OFF) is still pumping down.
For the commute, crack sealing dealys on SR240 from Twin Bridges to the ORV park road (not sure where it starts in town)...actually WSDOT notes this chip seal work is from Milepost 8 to 28.