TITLE: 09/11 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Tony
SHIFT SUMMARY:
Some prep work started for a vent of EX for in-chamber work on Monday (to address ETMx rubbing which returned yesterday).
Commissioners worked on mostly ALS work to possibly allow for DRMI work next week.
HAM7 + Filter Cavity added to the main volume!
LOG:
- (all-day) beam tube enclosure patch work with manlift (randy)
- 1500-1526 JAC remote measurements (masayuki)
- 1638 Aligned Green Y-arm (ALS_YARM to INITIAL ALIGNMENT OFFLOADED)
- Elenna will be working on X-arm (I had touched up green X-arm flashes, but I backed this out because Elenna will be working on X-arm)
- 1734-1752 dustmonitor huddle test in optics lab (ryanC)
- 1909-1947 JAC measurements (masayuki)
- 2025-2114 Opening HAM7 + Filter Cavity into the main volume & turning off HAM7 turbo (gerardo)
- 2052-2213 Taking pelican case to H2PSL room and loading it with CRS parts for LLO (jim)
- 2055-2116 measurements around BSC3 (jenne)
- 2119-2158 Moving equipment from LVEA to EX in prep for vent (gerardo.travis)
- 2142 M6.6 Christmas Island EQ notification
- 2144 EQ mode activated
- 2215 EQ mode activated
- 2151-2227 Scoping out plumbing for tcs (tj)
- 2145 EX cleanroom turned ON -and- purge air compressor + dryer tower turned ON for EX vent (gerardo)