(Travis S., Gerardo M.)
The cleanroom above BSC9 is on, 2:45 pm today.
The purge air system is on, compressor and dryer towers are on, but only in the vacuum support equipment room, the valve to deliver air to the VEA is closed.
We delivered two ISP-1000 scroll pumps and an electrical bang box, we left them inside the receiving area.