TITLE: 09/22 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Maintenance day wrapped up without much of a fuss. EX ans CS gate valves are still closed making this afternoon's locking unusual. I just finished a modified initial alignment described below.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:52 | VAC | Norco | CP2 (CS) | n | LN2 fill | 16:52 |
| 14:57 | FAC | Kim | EX | n | Tech clean | 16:04 |
| 15:09 | VAC | Jordan | LVEA | n | Prep for leak checking | 15:31 |
| 15:37 | PCAL | Tony, Caroline | PCAL lab | y | Prep for end station meas | 15:47 |
| 15:37 | CDS | Erik | Office | n | h1calcs restart and DAQ restart | 16:09 |
| 15:50 | PCAL | Tony, Caroline | EX | YES | PCAL meas | 18:23 |
| 16:04 | FAC | Kim | EY | n | Tech clean | 17:46 |
| 16:25 | PSL/JAC | Jason | PSL encl. | LOCAL | Check JAC PD alignment | 17:17 |
| 16:39 | FAC | Chirs, Randy | EY,CS,EY | n | Shuttling snorkel lift to EY | 17:02 |
| 16:47 | CDS | Fil | LVEA | n | Install 24V power cables from LY vac rack to BSC8 | 18:03 |
| 16:55 | VAC | Jordan | LVEA | n | Check on leak detector background | 17:03 |
| 17:02 | FAC | Randy | Yarm | n | Beam tube enclosure hole repair | 21:48 |
| 17:18 | VAC | Travis, Jordan, Gerardo | LVEA | n | Leak checking beam tube | 18:41 |
| 17:23 | FAC | Chris | Outbuildings | n | FAMIS and safety checks | 19:08 |
| 17:41 | OPS | Richard | LVEA | n | Checking on teams | 17:59 |
| 17:46 | FAC | Kim | LVEA | n | Tech clean | 18:48 |
| 18:00 | PEM | Robert | LVEA | n | Check on PEM sensors | 21:13 |
| 18:03 | CDS | Fil | LVEA | n | BNC cable removal in bier garten | 18:45 |
| 18:20 | VAC | Norco | MX | n | LN2 fill | 20:20 |
| 18:25 | SUS | Ryan C | CR/EX/EY | n | SUS charge measurements | 21:28 |
| 18:28 | PCAL | Tony, Caroline | PCAL lab | y | Post end station measurement | 18:49 |
| 18:29 | SUS | Oli | LVEA | n | Flipping switch on BS sat amp box | 18:34 |