TITLE: 09/15 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
- 2000 Covering Afternoon DAY shift (from TJ)
- 1945 JAC modematching post eom-install (masayuki)
- 2005-2050 Checking on VAC crew @ EX (gerardo)
- 2015 Travis joining
- 2025 Tony & Randy out
- 2042-2223 TCS plumbing clean-up (removing old piping and cutting pipe...soldering possibly tomorrow [tj]
- opened vestibule Exit near the Y-Beam Manifold for old tcs pipes (no access alarm yet)
- 2107 oli joining
- 2227 clean-up & trash removal (tj)
- 2106-2109 returning equip to Cleaning Room area (travis)
- 2119-2251 PSL lens adjustment from masayuki's mode matching (jason.ryanS)
- 2149-2305 leak detector to EX & continue pumping annulus (jordan,gerardo.travis)
- 2150-2228 checking vea camera install options at EY (fil)
- 2221-2244 LVEA & optics lab trip to gather viewport installation parts (camilla)
- 2252 jac mode matching mesurements at 62W post-lens-moves from jason/ryanS (masayuki)
- 2300-2326 Local Laser Hazard for Squeezer (sheila)
- 2326 LVEA to Laser HAZARD (camilla)