After closing up BSC9 yesterday we started pumpdown of the EX volume this morning using the two mobile ISP1000 scroll pumps.
There was minimal overpressure in the system, so I could not get a good dewpoint measurement of the blow down air.
It took ~6 hours to rough the system down from atmosphere to ~500 mtorr, where we start the turbopump.
The cooling water was adjusted on the turbopump stand so that the pump and controller pressures were <= 40C. Once the turbo was at full speed and the inlet pressure ~5e-5 Torr, I switched the backing pump to the dedicated ISP250 on the turbo stand.
Setpoints were adjusted to 5E-2 Torr on Channel 1 (Foreline) and 5E-5 Torr on Channel 2 (Turbo inlet).
We will need to leak check the TMDS port gate valve since it was removed to verify the gate o-ring was in place.
Also, the EX cleanroom was powered off at ~3:10 pm local time.