TITLE: 09/17 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Corey
SHIFT SUMMARY: *I forgot to click post for this last night*
The LVEA was transitioned to SAFE, the CHETA viewports were installed, EndX pump down continues, and the HAM2 CPS cables were rerouted. Commissioners spent the afternoon touching up some corner alignment then they worked on PRMI and some phasing. A few optics lab and PSL anteroom dust alarms in the late afternoon, corresponding roughly with wind increase but the wind increase 3 hours previously did not increase the dust counts.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:26 | OPS | Betsy | LVEA | Y -> N | Transition to laser SAFE | 15:42 |
| 15:30 | VAC | Jordan | EndX | N | Check on pump down | 16:22 |
| 15:37 | FAC | Kim | FCES | N | Tech clean | 16:49 |
| 15:40 | VAC | Gerardo | LVEA | Y -> N | Vent BSC7 volume XARM | 16:43 |
| 15:42 | ISC | Betsy | LVEA | N | Checks | 15:44 |
| 15:48 | CRS | Jim | LVEA, H2 | N | H2 PSL room, wrap and bag parts | 18:16 |
| 15:49 | EE | Fil | LVEA | N | HAM2 cps cabling, L4C chassis work | 18:26 |
| 15:49 | VAC | Camilla | LVEA | N | Bring out viewport parts | 15:59 |
| 15:51 | FAC | Mitch | LVEA | N | Checks | 16:00 |
| 16:25 | FAC | Chris + contractor | LVEA | N | North bay crane work | 18:13 |
| 16:34 | VAC | Jordan, Travis | EndX, High bay | N | Bring pumps from EndX to high bay | 17:08 |
| 16:43 | VAC | Camilla, Gerardo | LVEA | N | Yarm viewport swap with Gerardo | 20:00 |
| 16:47 | FAC | Richard | LVEA | N | Safety checks | 17:37 |
| 16:47 | TCS | TJ | LVEA | N | Cleaning up | 17:54 |
| 17:08 | VAC | Jordan | LVEA | N | Viewport swap | 20:17 |
| 17:30 | CAL | Tony | EndX | N | Turn on PCAL laser | 17:59 |
| 17:31 | VAC | Travis | LVEA | N | Check with VAC crew on viewports | 18:50 |
| 17:56 | FAC | Kim | MY | N | Technical cleaning | 18:46 |
| 18:00 | FAC | Richard | LVEA | N | Give crane documents to Travis | 18:07 |
| 18:16 | SEI | Jim | LVEA | N | Join Fil to finish CPS cabling | 18:26 |
| 18:32 | EE | Fil | LVEA | N | Remove camera used for cartridge removal, by Yarm | 20:29 |
| 20:43 | VAC | Jordan | LVEA | N | Start pump down for BSC8/7 volumes | 22:12 |
| 20:46 | CAL | Tony | PCAL lab | LOCAL | New laser inspection | 22:16 |
| 20:47 | TCS | TJ | High bay | N | Water access | 22:09 |
| 21:06 | VAC | Gerardo | LVEA | N | Join Jordan with the pump down | 22:11 |
| 21:07 | VAC | Richard | LVEA | N | Help VAC team with the pump down | 21:31 |
| 21:17 | VAC | Travis | LVEA | N | Join VAC team | 22:06 |
| 22:11 | TCS | TJ | LVEA | N | Put buckets under new tcs lines just in case | 22:21 |
| 22:44 | TCS | TJ | LVEA | N | Cover outlet hole | 23:00 |
| 23:16 | TCS | Camilla | Vac prep, Optics, and LVEA | N | Clean up | 00:16 |
| 23:22 | CRS | Jim, Mitch | LVEA | N | H2 PSL wrap and bag | 00:22 |