TITLE: 09/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: MAINTENANCE
Wind: 5mph Gusts, 2mph 3min avg
Primary useism: 0.01 μm/s
Secondary useism: 0.07 μm/s
QUICK SUMMARY:
Whoops, I forgot to post EVE summary last night (left site around 730pmPDT; here it is:
TITLE: 09/17 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: None
SHIFT SUMMARY:
Elenna/Louis/Keita were looking at MICH Pitch ASC Error signal with PRMI at beginning of the shift (see Elenna's alog).
Using PRM to put a line on AS_A_B and look at all quadrants' I & Q. Want to see the line only on Q, so adjust the Rotation Angle of AS_A_B while watching I's & Q's
Once commissioning work was done, handed h1 over to Jim for HAM2+3 measurements.
LOG: