TITLE: 09/22 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Oli
SHIFT SUMMARY:
Beckhoff issues were resolved before noon.
End X's Gatevalve GV 20 is still closed and will remian closed for now.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:47 | EE | Fil | MSR & EY | N | Checking Fiber connections to Beckhoff | 17:47 |
| 15:49 | FAC | Chris | X-arm | N | Talking to Randy about the Snorkle | 15:19 |
| 15:51 | FAC | Randy | X-arm | N | Tar snaking & other road maintenance. | 18:51 |
| 15:57 | LVEA | Jordan | LVEA | n | Checking on pumps | 17:43 |
| 16:16 | FAC | Chris | Outside CS | n | Using Snorkle lift to installing bird anti-perch near vents | 17:44 |
| 16:16 | ALS | Elenna | CTRL RM | N | Initial alignment & Locking DRMI | 18:16 |
| 16:50 | VAC | Jordan & Gerardo | EX | N | Checking for Leaks at EX | 17:44 |
| 17:10 | PEM | Ryan C | Optics Lab | N | Checking Dust monitor status. | 17:48 |
| 18:57 | VAC | Jordan & gerardo | LVEA | N | Craning Leak detector over the X arm | 19:29 |
| 20:57 | SUS | Rahul | Optics/prep | n | Checking ISS hardware | 20:59 |
| 21:30 | DetEng | Betsy | EX | N | Cleaning up from Vent | 21:00 |
| 21:44 | Contam | Ryan C. | CER | N | Putting boxes away | 21:54 |
| 22:10 | VAC | Jordan Gerardo | EX | N | Gate Valve 20 work | 23:38 |