In preparation for the installation of the Newtonian Noise Array, a power cable was installed from the LY Vacuum rack to BSC8.
Removed 7 BNC cables routed from the Biergarten to SUS-R3. Cables last used two years ago and causing tripping hazard by HAM4 /SUS-R4.
F. Clara, R. Schofield