Reports until 16:38, Wednesday 23 September 2026
H1 General
ryan.crouch@LIGO.ORG - posted 16:38, Wednesday 23 September 2026 (92027)
OPS Wednesday day shift summary

TITLE: 09/23 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: DRMI and SQZ were commissioned today, we can lock on DRMI_3f now.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:55 SUS RyanC CR/EX N OPLEV charge measurement ETMX 16:12
15:01 FAC Randy YARM N Beamtube enclosure repairs, YARM --> CS 19:33
15:14 FAC Kim H2 N Tech clean 15:25
16:11 TCS TJ LVEA N TCS pipe end capping 16:25
17:09 SUS Rahul Optics lab N ISS PD 3IFO work 17:55
17:14 FAC Mitch, Betsy EndX N Furniture arrangement 19:01
17:19 SPI Jennie LVEA N SPI racks check by HAM2, unplug cables 17:25
17:35 VAC Jordan, Gerardo EndX N Annulus Ion pump work 18:28
18:42 SPI Jennie LVEA N Plug cables back in SPI racks 18:59
19:33 FAC Chris, Randy EndX N Set up scaffolding around GV20 21:17
21:16 FAC Randy, Chris LVEA N Craning in west bay, near term slab, back out 2205 21:46
21:24 VAC Travis, Gerardo EndX N Return parts to CS, leak detector... 22:32
21:24 SEI Jim CER N Look at  AA chassis ports 21:29
23:04 TCS Camilla Prep lab N Put tools away 23:19
23:20 VAC Gerardo, Jordan LVEA N Check GV 1 & 2 valves Ongoing
Images attached to this report