Displaying report 1-1 of 1.
Reports until 16:00, Thursday 01 October 2026
H1 SUS
corey.gray@LIGO.ORG - posted 16:00, Thursday 01 October 2026 (92143)
Morning Work:

(Elenna C, Camilla C, Sheila D, Corey G, TJ S)

With both gate valves opened up last night at EX, work on recovery of EX for green arm locking began this morning.  RyanC mentioned in his summary last night that the ALSx laser was OFF, but  TJ found that it was ON this morning (as well as PCal laser and also High Voltage).  

ALSx Work

With the return of the X-arm, started out looking alignment for the Xarm with Baffle Alignments.

Overall:  It's thought the issue was mianly due to small misalignments for ISCTEX and the TMS

ALSy Work

Had good flashes for the Y-arm this morning same as noted by RyanC last night.  RyanC mentioned ITMy might not be in a good spot because he couldn't lock the y-arm.  But TJ was able to lock up the y-arm this morning (took ALS-Y guardian to LOCKED_SLOW_WFS_ETM_TMS). 

Separately from ALSx work, Elenna looked at Green Camera Offsets for ALSy:  "Since the baffle align script ran successfully for the y arm, I set the new green camera offsets for ITMY. This screenshot shows the SDF [attached]. The y arm ASC had converged properly before I reset the offsets. This alog: https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=91841 you can reference for how this procedure is done."

Alignment Notes

Since we have no WFS (need to get rephased), still need to run a Manual Initial Alignment.  

Moved on to DRMI locking

[Currently, they have locked PRMI and currently are working on DRMI!]

Images attached to this report
Displaying report 1-1 of 1.