TITLE: 10/02 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: None
SHIFT SUMMARY: Not much to report, there's an issue with the TR_CARM states to be further addressed tomorrow. Jim and Arnauld worked on some CRS damping. ISC_LOCK is being held in down. Arnaud might touch the CRS a little more tonight.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 22:57 | pcal | tony.camilla | pcalLab | yes | beam profiling | 23:55 |
| 23:25 | cheta | sophie | ChetaLab | no | cheta work | 23:42 |
| 00:14 | TCS | Sophie | CHETA lab | N | Recover laptop | 00:15 |
00:15 UTC A few HAM3 ISI trips from CRS testing