Displaying report 1-1 of 1.
Reports until 16:31, Monday 05 October 2026
LHO General
ryan.short@LIGO.ORG - posted 16:31, Monday 05 October 2026 (92182)
Ops Day Shift Summary

TITLE: 10/05 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Majority of the day was spent commissioning the mode hopping problem in DRMI and some work towards moving past TR_CARM (commissioners will post their own alog with the details). The LVEA is also Laser HAZARD for HWS table work.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:55 FAC Kim Optics Lab - Technical cleaning 15:15
15:15 FAC Kim MX - Technical cleaning 16:38
16:15 PEM Fil OSB Roof - Checking anemometer 17:27
17:14 TCS Camilla Prep Lab - Grabbing cable 17:29
17:52 EE Fil MY - Picking up cables 18:26
18:00 TCS Camilla, Sophie Prep Lab - CHETA table work 18:16
19:57 PEM Miranda, Alex MER - Looking at PEM kits 20:05
20:06 TCS Camilla, Sophie LVEA - Checking CHETA cables 20:22
20:26 TCS Camilla, Gerardo Prep Lab -   21:10
20:33 ISC Keita, Alex LVEA - OMC function generator changes 20:40
20:44 SEI Jim, Jennie CER - Checking SPI chassis wiring 20:50
22:01 SAF TJ LVEA Y Transitioning to Laser HAZARD 22:12
22:12 TCS TJ, Camilla LVEA Y HWS table alignment 00:12
22:37 TCS Sophie Prep Lab - Quick measurements 22:52
Displaying report 1-1 of 1.