Reports until 18:34, Monday 05 October 2026
H1 General
anthony.sanchez@LIGO.ORG - posted 18:34, Monday 05 October 2026 (92185)
Monday Eve Shift report.

TITLE: 10/06 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: None
SHIFT SUMMARY:

Comissioning team ran ISC_Lock up to Start_TR_CARM a few times which ended in locklosses and left it in Down for the night.
They put together an informative alog about their work that says that Initial Alignment WFS should hopfully work for input align and PRC, SRC!  

Camilla is planning to make a TCS ring heater change tonight around 8. I have put her on the Reservation system for that time as well.

LOG:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      

Start Time System Name Location Lazer_Haz Task Time End
20:00 TCS Camilla Remote N Ring heater settings change around 8PM local time 20:30